Part 07 · Clubs and races

35Planning a race

The Planning group of the manage page: a budget that follows the expected entries, the break-even entry fee, a checklist with know-how shared with your staff, and a check that tells you what you forgot. It opens when the competition's creator or a manager of its club is on Plus; every staff member then plans there, whatever their own plan.

Mixed, see chapter

Who sees Planning#

Where Dashboard › Competitions › Manage › Planning

Planning has three tabs in the rail: Overview, Budget and Checklist. The planner belongs to the competition, not to the person looking at it. It is open when the competition's creator, or an owner, admin or editor of its club, is on TerraLoc Plus or Pro (see Plans and billing). Then everyone on the staff with a planning right uses it, on any plan, Free included, and the whole team sees one plan.

Right What it allows Who has it by default
View planning See the budget, the checklist and the overview, and tick off and write notes on your own tasks. Every staff role except Athlete
Manage planning Change the budget and the checklist, and assign tasks to staff. Organizer Admin, the creator and the club's managers

Give or take these rights for one staff member with a capability override, see Staff and roles.

When nobody behind the competition is on Plus, staff who may manage the plan see the three tabs with a lock, and each shows a short tour headed Plan the whole race, budget included, with See the plans. Staff with only View planning do not see the Planning group at all then.

Starting the plan#

The first time you open Planning, it asks how to begin, under Start your plan. Staff with view rights only see No plan yet until a manager starts it.

  1. If you planned a race before, Start from an earlier plan lists those plans. Picking one brings your lines with the prices you paid, and your checklist with its notes, moved to this race's date. Agreed prices come back as estimates until you agree them again; a plan in another currency brings its prices back as Quote needed.
  2. Otherwise answer Where does the race start?: Start and finish in one place, or Point to point, which adds the shuttle to the start and the bag transport to the finish.
  3. Pick a template, or Start empty for only the entry fee.
Template For
Trail or ultra trail A mountain route with aid stations, marking, sweepers and the mountain rescue, and a full checklist from the permits to taking the marking down.
MTB or gravel race Road crossings and closures, an ambulance, aid stations and sweepers, with the checklist for the traffic plan.
Triathlon or swimrun Swim safety and the water temperature, the transition area and a route with its legs, plus everything a run or a ride needs.
Club race A small club race, hike or ski touring race: race numbers, an aid station, first aid, marking and a short checklist.

Each card says how many budget lines and tasks it adds. The plan starts from your competition: expected entries are four in five of the field limit in Settings (100 when there is no limit), the event days come from its dates, and the kilometers to mark and the aid stations from the routes you placed. You can change all of it.

Later, Templates on the Budget and the Checklist adds the lines and tasks of another template you do not have yet. Nothing is replaced.

The Overview#

The Overview says where the money goes, what is still open and what you might have missed. The line above the title counts the days to go, then says Under way during the event and Finished after it.

Entry scenario switches every figure between three numbers of entries: Low turnout (a share of the expected entries, 60 % by default), Expected, and Full field (the field limit in Settings).

Break-even entry fee
The total cost divided by the entries of the scenario, next to the fee you charge.
Total cost
Every cost line plus the reserve, and the number of entries from which the race is covered at your fee.
Result
Income less total cost: Surplus or Shortfall. While cost lines still lack a price it says how many, because a result without them would mislead.
Checklist
Tasks done of all, how many are overdue and how many nobody has.
  • Where the money goes: the cost split into the budget's sections.
  • Entry scenarios: a bar per scenario with its total cost and a dashed mark for its income. Click a bar to switch.
  • Did you forget something?: what a race of this size usually has and this plan does not, checked against the standard plan. For example no medical team, no permit, no sweepers, no event liability insurance, an entry fee below break-even, a low turnout shortfall, overdue or unassigned tasks, prices waiting for a quote. Each check offers a button to fix it, such as adding the line or the task; a manager can dismiss a check that does not apply.
  • Due next: the open tasks by due date, and Team: open tasks per staff member. Staff who only view see Your next tasks instead, the tasks assigned to them.

Excel and PDF export the plan, from the Overview and the Budget.

The Budget#

Every line follows your assumptions and the entry scenario: change the expected entries and every line that counts per athlete moves with it. The prices are yours; the standard items only give a starting point.

Expected entries
1 to 20000

The entries you plan with. The line under it shows how many registered and how many are confirmed.

WhenUpdate it as registrations come in.

Low turnout
0 to 100 %

The low turnout scenario as a share of the expected entries, 60 by default.

WhenHow bad could it get.

Event days / Race days
1 to 30

Days for per day costs. Taken from the competition's dates at the start.

WhenA prologue or a rest day.

Staff / Marshals and volunteers
0 to 500 / 0 to 2000

People to feed, dress and house. Volunteers start at one per ten athletes, at least 10.

WhenOnce you know your team.

Aid stations
0 to 100

Starts at about one per 10 km of the longest route.

WhenWhen the route is final.

Km of route to mark
0 to 5000

Starts from the routes placed on days.

WhenWhen the routes are final.

Reserve on the total
0 to 100 %

Added on top of every cost, 10 by default.

WhenRaise it while many prices are guesses.

Field limit beside them is read only: it comes from Settings and drives the full field scenario.

The lines sit in five sections: Athlete package (grows with every entry), Pasta party and prize giving, Staff and volunteers, Event costs (mostly fixed, however many enter) and Income (entry fees, sponsors and contributions). Each line has a name, a basis, a unit price and its total, with the cost per athlete.

  • The basis says how a line counts: Fixed amount, Per athlete, Per athlete, per race day, Per staff, per night, Per km of route, Per aid station, per race day and more. For a counted basis like Per unit you type the quantity; the others follow the assumptions.
  • The status chip says how sure the price is. Click it to step through Estimate, Quote needed, Quote received, Agreed and No cost.
  • Standard items opens the library: search it (for example toilets), then drag an item into a section or tap +. Set your own price after.
  • Add line and Add income open the library for that section; Custom line adds a line of your own. Drag lines to reorder or move them between sections; the arrow keys do it too.
  • Summary at the bottom totals the sections, the reserve, the income and the result for the chosen scenario.
Note

With view rights only, the budget is read only and says so at the top.

The Checklist#

Everything to organize, from fixing the date to taking the marking down, in five phases dated back from your event days.

Phase Dates
6 months or more before Until 121 days before the start
3 months before 120 to 46 days before
1 month before 45 to 8 days before
Race week The last 7 days to the last event day
After the race From the day after the event

The bar at the top shows how many tasks are done. The filters All, Mine, Open, Overdue and Unassigned narrow the list, each with its count. A task row shows its title, a chip for a linked budget line with its cost, a chip that opens the place in TerraLoc where the task is done, Know-how and Notes chips when there are any, the due date (red when overdue) and who has it. Tick the box to mark it done.

Click a task to open its details. A manager sets:

Assigned to
A staff member, from the Staff tab.
Due and Phase
When it has to be done.
Done in TerraLoc
The tab of the manage page where it gets done, for example Routes or Emails. The task then links straight there.
Budget line
The line the task pays for.
Know-how
What to watch out for, who to call. The templates bring theirs.
Notes for the team
Who you talked to, what was agreed, the next step. The assigned person writes here too.
Delete task
Removes it.

Add task adds one of your own. Drag tasks to reorder them or move them to another phase. Staff with view rights see the whole plan and can tick off and write notes on the tasks assigned to them.